Phase I — Interim operating authority

Cislunar power,
beamed to the terrestrial grid.

Selenion is the regulated utility that collects solar energy at the lunar surface, beams it down through a coordinated transmission network, and delivers it through the existing grid as firm, dispatchable, clean baseload — not another intermittent injection.

selenion@polsia.app — single point of contact for utilities, federal sites, and offtake counterparties.

384,400 km
Source-to-grid distance
24/7
Lunar irradiance cycle
GWh
Storage tie-in commissioned
FERC
Process posture: licensed

Capabilities

The chain from regolith to grid.

Five stages, owned end-to-end. Each link is engineered to keep the energy firm — which is the contractual obligation utility counterparties actually need, and the one a pure-physics demonstration cannot offer.

  1. Stage 01

    Lunar Collection

    Photovoltaic arrays sited on the rim of Shackleton crater and on cislunar platforms — 384,000 km of free, uninterruptible solar irradiance, no atmospheric loss.

  2. Stage 02

    In-Space Conditioning

    Solid-state power management and thermal regulation rated for the radiation environment of cislunar space — no mechanical single-points-of-failure.

  3. Stage 03

    Targeted Beamed Transmission

    High-efficiency microwave downlink to licensed rectenna sites, phased-array steered and frequency-coordinated with incumbent users.

  4. Stage 04

    Grid-Side Interconnection

    HV interconnect delivered through FERC- and ISO/RTO-compliant process modeling — interconnection studies, firm capacity accreditation, and tariff certification.

  5. Stage 05

    Dispatchable Delivery

    Tightly integrated with utility-scale storage so lunar supply is delivered as firm 24/7 baseload — not an intermittent injection into an already-constrained grid.

Markets

Four customers. One supply curve.

Selenion does not chase the kilowatt-hour at retail. We sign structured offtake with counterparties whose buying need is firm capacity, not marginal energy.

01

Federal & Defense

Resilient power that cannot be disrupted at the fuel line.

Forward bases, hardened sites, and critical C2 infrastructure where resilience beats lowest-LCOE. Lunar-sourced supply is by definition independent of terrestrial fuel logistics, atmospheric weather, and adversary strike on terrestrial generation.

02

Grid Operators & IOUs

Firm clean baseload to complement intermittent renewables.

A regulated supply curve at the very thing grid planners say they cannot buy: clean capacity that is firm across diurnal cycles and seasonal weather. Settled into RTO/ISO capacity markets under existing tariff structures.

03

Disaster Relief & Remote Sites

Energy where the wires do not reach.

Island grids, post-event restoration, and remote industrial loads — delivered via rectenna + storage as a self-contained kit. No fuel convoy, no field-crewed generation.

04

Orbital & In-Space (Galactic Brain)

Power for the next generation of orbital compute.

On the longer horizon, the same source sells directly to the in-space customer: data-center constellations and high-power orbital platforms for whom downlink is a constraint, not the product.

Why Selenion

Not another SBSP demo. Not another variable generator.

The market map already has two entrants. Selenion occupies neither slot — and that is the entire thesis. We are the regulated utility that closes the loop between space-side generation and the kilowatt-hour on a residential meter.

Satellite-Only SBSP Startup

Other
Source IP
Generic LEO downlink architecture
Regulatory
No utility license; treated as a generator
Dispatch
Variable; injected as intermittent supply
Storage tie-in
Procurement-stage MOU

Selenion

Our slot
Source IP
Lunar-surface + cislunar collection portfolio
Regulatory
Interstate transmission + utility operating authority
Dispatch
Firm 24/7 baseload via storage integration
Storage tie-in
Commissioned GWh-scale, operational today

Traditional Terrestrial Utility

Other
Source IP
Combustion or terrestrial renewables
Regulatory
Established, but fuel-line exposure
Dispatch
Firm, but carbon-constrained
Storage tie-in
Operational at GWh scale

FAQ

What counterparties ask first.

Anything not covered: write to us directly. Single point of contact, single inbox.

selenion@polsia.app

Engage

We are signing the first structured anchor offtake in Phase I.

If you operate a regulated load that buys firm capacity — a defense installation, an RTO market participant, a remote-grid operator, or the planning team behind one — start a conversation. The first set of counterparties shapes the procurement and the rate base.